
Suffolk Academy located in Suffolk, VA was Coles first major commercial project he led. Consisting of six cemented ground post, the awning is put together consisting of two major parts. One being held onto the wall and attached and the other having to be attached in mid air without post support to have everything perfectly aligned.

Cole and his crew would then have to lock the frames together, accurately place post, lock them into the frame, and plant the post in the ground at depth sufficient to code. Lastly, the frame would be dressed with 40 foot long fabric and strategically tied to have a clean look.
With various task to execute accurately for a satisfactory product, Cole and his crew would complete these numerous task all in a day to deliver a great product to a happy and satisfied client.
